Recent Projects
Construction
- Dan Bank Road and Slope Stabilisation
- LC08 Halewood, Greengates Primary School
- Amey, Cumbria Surfacing 2011
- Greenbridge Lane Retaining Wall Re- construction
- Potato Wharf
- A635 Manchester Road Retaining Wall Strengthening
- Tesco Store, Litherland
- Aldi, Bamber Bridge
- Whalley New Road, Blackburn
- Irk and Douglas UID’s
- Phillips Road Culvert, Blackburn
- Newfield and Talbot Shool
- Stalybridge Station
- Sandon Dock Air Mixing
- Townside Fields, Bury
- Charlton Drive
- Irk & Douglas UID’s
- Stars Brook Pumping Station
- Aldi, Old Colwyn
- North Huyton Specialist Skills Centre
- Chapel Street Pedestrianisation
- Victoria Park Lake
- The Rock
Bethell Construction
Amey, Cumbria Surfacing 2011
Through an open tender process Bethell’s surfacing division was awarded £1.3m worth of sub-contract surfacing works from the incumbent contractor working for Cumbria County Council. Amey, had 38 individual projects that needed to be completed in the Cumbria region for the authority. The awarded surfacing contract commenced in early July 2011 and were all completed by late September. The schemes ranged in value from £5,000.00 to £250,000.00 and contained many varied surfacing specifications from 32mm & 20mm binders, 10mm/14mm’s to thin surface courses to HRA with chippings with various PSV’s.
