Recent Projects
Construction
- Dan Bank Road and Slope Stabilisation
- LC08 Halewood, Greengates Primary School
- Amey, Cumbria Surfacing 2011
- Greenbridge Lane Retaining Wall Re- construction
- Potato Wharf
- A635 Manchester Road Retaining Wall Strengthening
- Tesco Store, Litherland
- Aldi, Bamber Bridge
- Whalley New Road, Blackburn
- Irk and Douglas UID’s
- Phillips Road Culvert, Blackburn
- Newfield and Talbot Shool
- Stalybridge Station
- Sandon Dock Air Mixing
- Townside Fields, Bury
- Charlton Drive
- Irk & Douglas UID’s
- Stars Brook Pumping Station
- Aldi, Old Colwyn
- North Huyton Specialist Skills Centre
- Chapel Street Pedestrianisation
- Victoria Park Lake
- The Rock
Bethell Construction
Potato Wharf
This project involved the hard landscaping of the Public Realm areas around two new 8-storey apartment blocks in Castlefield, Manchester city centre.
Works undertaken included:
Extensive hard landscaping involving modular paving and bespoke natural stone paving including granite setts
The removal of existing hard surfaces and disposal off site
Soft landscaping including tree planting to create a shared community area for residents.
Installation of surface drainage and channels
Installation of bespoke street furniture
Replacement of stone coping stones to adjacent canal
All works were compliant with DDA regulations.
