Tameside Day Hospital

The Mental Health Unit is located at the far South East corner of the Hospital site backing onto Mellor Road. The building refurbishment works were carried out within the site hoardings with limited access for materials and plant.

Only part of the Mental Health Unit was refurbished and access into the construction site was through existing doors to the gymnasium area.

The main elements of work were:

Demolition works:

Masonry:

M & E:

Joinery:

Internal fit out:

Click to Enlarge Click to Enlarge

Tameside Day Hospital

Client:West Pennine Care NHS Trust

Value:£600,000

Location:Tameside Hospital – Mental Health Unit

Duration:June – Oct 2007