Carrington Power Station

The new £800m Carrington Power Station is an 880 MW CCGT Power Station developed by Trafford Power to replace the coal fired station from the 1950s. It will deliver 3 times the output of the coal station on 50% of the land use.

Bethell were engaged by the EPC Contractor to carry out the programme of external finishing works, working around the sequenced commissioning and bringing into service of the plant. The scope of works included: