Charlton Drive, Cheshire

Bethell Construction were appointed on a negotiated design and build basis following the agreement of cost and specification.

They in turn appointed Bethell Utility Services to provide the multi-utility installation for the 20 units which consisted of the design, installation (both internal and external), commissioning and installation of meters in conjunction with the chosen energy suppliers.

The overall project was delivered to very tight timescales which was assisted greatly by utility services provided a fully integrated service to the Construction management team.