    Garstang WwTW works is operated by United Utilities and there was a regulatory need to provide additional storm water storage to allow the Works to meet its EU and OFWAT compliance targets.

    Client: United Utilities / KMI+ (Project Manager)
    Value: £570,000
    Location: Garstang, Lancashire
    Duration: 16 Weeks

    Bethell Construction was awarded the contract to construct the new tanks which comprised of three side-by-side structures with overall dimensions of 30m x 30m x 6m high. The works involve the fixing of over 200 tonnes of steel reinforcement and the placement of 1200m3 of high strength water retentive concrete. High level suspended channels were cast on the inflow and outlet sides of the structures.

    The works were completed within a restricted construction site as KMI+ were constructing other extensive works around the tanks.

    Print this case study

    Get in touch

    Call us today on +44 (0)1204 439 100 for more information on all our services.
    Alternatively please email us or fill in the contact form and we’ll get back to you.