Monks Cross, Whalley

Works consist of the installation of approximately 1700m of water, electric and gas mains on site and the connection of 137 new dwellings located near to Whalley village.

Due to the sensitivity of the development (near to the village, aqueducts and flyovers), Bethell liaised very closely with the David Wilson Management team, the local authority and Bridge Inspectors in order to make sure disruption was kept to a minimum and that the local authority were happy with our proposed designs adjacent to the couple of bridge structures in the vicinity.

The site commenced in September 2016 with an anticipated build programme of 3 years. Bethell will be installing all gas and water meters.