    Bethell were appointed to undertake all the external works
    surrounding the impressive new school buildings.

    Client: Taylor Woodrow/ Sheffield City Council
    Value: £2,240,000
    Location: Sheffield
    Duration: 36 Weeks

    The extent of the workscope included the following works –

    The majority of the work undertaken by Bethell consisted of the installation of bespoke high quality paving.

    The site was challenging as it is steeply sloped and paving was constructed on a variety of levels overlooking Sheffield Town Centre and each ‘terrace’ was constructed differently using a variety of construction materials.

    Other works included construction of a MUGA pitch, substantial feature gabion walls, bulk earthworks and all asphalting works.